Sunday, December 18, 2011
Monday, December 5, 2011
Mushrooms, mushrooms everywhere and yet none to eat.
Monday, November 28, 2011
Saturday, November 12, 2011
Twi'lek Bounty Hunter
More Mushrooms
Thursday, October 20, 2011
Monday, October 10, 2011
Aliens vs. Indians
Wednesday, September 21, 2011
Final Storyboards
Rough and Tumble Storyboards
Darkhorse Espresso T-Shirt Designs
Espresso Sketching
Tuesday, August 16, 2011
4 step program in 3 images
For my last contract time was very short. I had to produce 14 illustrations in less then 4 weeks, 25 days.
Here is an example of the different stages in producing these drawings. Note how rough the sketch is. At the beginning there was no clear vision of style or mood. It had to be figured out as we went. So the sketches were kept loose in anticipation of change, also, they were done with an aesthetic direction in mind that in the end the project did not go with.
The posting is called "4 step program in 3 images" because I inked directly onto my pencils, so there was a second stage to the rough sketch, finished pencils.
Here is an example of the different stages in producing these drawings. Note how rough the sketch is. At the beginning there was no clear vision of style or mood. It had to be figured out as we went. So the sketches were kept loose in anticipation of change, also, they were done with an aesthetic direction in mind that in the end the project did not go with.
The posting is called "4 step program in 3 images" because I inked directly onto my pencils, so there was a second stage to the rough sketch, finished pencils.
Kids Stuff
Rough Cuts
Friday, May 13, 2011
Subscribe to:
Posts (Atom)